Evaluate and correct the applicable production processes
t?.
and procedurcs to prevent, recurrence of the same defect(s)
in future production.
c.
Examine linker-delinkers, partially assembled linker-
delinkers, and components (including components and sub.
assemblies at in-process or final assembly) to insure that
material Containing the same defect is purged from the
inventory and not presented to the Government for acceptance.
Submit the results of the failure analysis and the correc-
d.
tive actions taken to the Government for review and approval
prior to submitting a reconditioned lot or reconditioned
linker-delinker for retest.
*
4.5.3.2 Functioning testing. Each linker-delinker in the inspection
lot shall be tested for Functioning (see 3.3) using the test method
specified in 4.6.1. Failure of any linker-delinker to meet these re-
quirements shall be cause f or reelection and the contractor shall perform
the corrective action specified in 4.5.3.1.
4.5.3.3 Component parts and concurrent repair parts testing. Raw
material testing, part testing, and (Certification shall be as specified
in the contract (see 6.1). This will include chemical analysis, physical
tests of materials, tests of protective finishes, heat treatment and
function of parts as applicable. These tests shall be accomplished
*
4.5.3.4 Packaging examination and testing. Unless otherwise
specified (see 6.1), the packaging examination and testing shall be in
4.5.4
Inspection equipment.
--
4.5.4.1 Acquisition, maintenance and disposition. Unless otherwise
specified (see 6.1) responsibilities for acquisition, maintenance and
disposition of acceptance inspection equipment Prescribed on the Index
of Inspection Equipment Lists, Drawing IEL11013156 and for all Other
inspection equipment required by applicable specifications, shall be in
.
accordance with MIL-I-45607.